Estelle & James popped in to drop xmas bottle to Kevin and check the water levels. Up to about 4" below the railway line and looking like we'll be flooded out for some time. Kevin has suggested we re-investigate the top dig as he feels it may go the other way. We'll plan a trip in the new year for this.
Wednesday, 1 January 2020
Thursday, 24 October 2019
22/10/19
Estelle Sandford, Dave King, Dave Walker
1hr
Went over armed with tools to take apart the remaining cable connections and to check the state of play. Disconnected the IP44 link easily with 2 people to pull on it so removed the grey socket cable for cleaning and drying. We then went in and looked at the water levels and took some photos. It's dropped about another 8-10" since yesterday so progress... Hopefully with less rain forecast it will dry out some more over the next week. We measured cable lengths a bit so we can plan how to put on a far more waterproof set up and resin seal anything likely to ever end up getting wet. Headed to pub to discuss ideas further!
checking the water levels 21/10/19
Estelle Sandford
1hr
I popped over with oversuit over clothes to check the status… The good news is that the water level has dropped considerably in that it is at the bottom of the first grill. The hole in the floor is still full though so not quite sure where it’s draining! Not wanting to get overly wet with no change of clothes, I carefully traversed the ledges enough to grab the pump and bring it back to the grill, only to find the cable seemed jammed and it didn’t want to come out… After some gentle flicking and tugging on the cable, it came away, bringing with it a pile of hauling rope that was obviously sat on top of it! The pump was soon bagged for removal to take home and clean and check over. Left the remaining cable in situ for now, although all is near the entrance.
1hr
I popped over with oversuit over clothes to check the status… The good news is that the water level has dropped considerably in that it is at the bottom of the first grill. The hole in the floor is still full though so not quite sure where it’s draining! Not wanting to get overly wet with no change of clothes, I carefully traversed the ledges enough to grab the pump and bring it back to the grill, only to find the cable seemed jammed and it didn’t want to come out… After some gentle flicking and tugging on the cable, it came away, bringing with it a pile of hauling rope that was obviously sat on top of it! The pump was soon bagged for removal to take home and clean and check over. Left the remaining cable in situ for now, although all is near the entrance.
Monday, 21 October 2019
15/10/19
from Mike - Mike Moxon & Jonathan Riley
Well, it's just as well we didn't
have a full turn out. I've included Kevin to find out what level the borehole
is at, as last time we had this much water, so did he...
Jon went down ahead of me & just
as I was about to join him he reappeared at the cars - turns out the first hole
on left was flooded to within view & the end was just below the top of the
steps. We both went down & pulled the cable up so the first join was well
above the water level. Both pools were c.5 to 6ft below the level of the
railway, although we're not 100% that they are at the same height. Jon
suggested that Nick could do a practice dive & recover the pump & tools
from the end. Early finish in the Hunters' then.
Wednesday, 9 October 2019
8/10/19 2 trips in one day!
AM
PM
Estelle Sandford, Nick Gymer
1hr
Andrew Atkinson was going to survey the stuff that isn’t on
the current survey, but had distoX problems, so cancelled today. I had arranged
to show Nick and it was beneficial to pump too probably, so went down anyway.
Showed Nick around the top stuff, before heading down to the end to check. End
was very wet and the water over the grill was flowing into the end and it was
at that height. Set the pump up and going whilst Nick went and looked at the
upper series and then we hung around until it had pumped enough to save time
tonight. Also took a chunk out of the dam as it seems pointless having it with
it filling up and overflowing and means only having to pump one place if we can
move the dam enough. It appears to be a rock step though. Once drained headed
out and home
PM
Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay,
Dave Walker, Chris Duberry, Nick Hawkes
2hrs
Pump was reactivated on arrival to clear the puddle area
above the dig as much as anything. Chris went in to dig first, followed by Nick
and then Stu had a dig – first time since his operation he had been to the end
and he was surprised by how much progress we’d made. We are down to 18 buckets
now, but Stu did an extra 10, helped by Estelle removing some of the remainder
of the dammed bit so now the top puddle mostly drains into the dig meaning one
pump location.
No digging planned for next week as a too many people are
unavailable and it’s unviable with the numbers left, but could do with a couple
of people planning to head over at some point to pump it so we keep on top of
it as it is needing about ½ hour per week with all the rain we are having. Also
on digging nights, be good if 1-2 can be there ½ hour early to get it going and
maximise digging time. Jon had provided new skip for the bottom run and we have
a spare for that too, the top one needs someone to take a knife down to trim
the back off as it’s very hard to load at the moment.
2/10/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley,
Dave Walker, Stu Lindsay
2hrs
Stu went inside the cave for the first time since his
operation and did the 2nd haul and was definitely a lot more
sprightly getting into the cave! We needed to pump quite a bit this week as
there had been a lot of rainfall in the last week, so the pump was going for
most of the session, Mike went in first to dig once it was low enough to work
around the edges and then Dave filled the second lot, only about 35 skips came
out as too much time wasted pumping.
24/9/19
Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay, Jonathan
Riley, Dave Walker
2hrs15mins
headed down and checked water levels after it had been torrential rain
for much of the last 48hrs, so was expecting it to be quite wet, but although
the water was up a bit, it didn't need pumping to work, but we chose to pump
out about a foot worth of water to make sure we were keeping on top of it in
case of more rain before next time. While pumping, Estelle got to digging,
mostly on the left and low, trying to clear down as low as possible on that
side to see if it was the bottom around the boulders. After 20 skips, swapped
and James dug, he also dug the same place, which being lots of nougat type
clay, was hard work and took quite a long time on his session. Jon then only
did 10 as was getting close to pub time, but he dug on the right of the
chamber, which was easy digging! The chamber is getting quite large now,
probably a good 3-4m long and about 2.5m wide and can stand up in bits of it
(where there are no boulders on the floor!) the bottom skip is desperate for
replacement. Stu still getting back into it slowly post op and Mike nursing a
hamstring injury so not able to do as much.
Wednesday, 11 September 2019
10/9/19
Estelle Sandford, James Begley, Dave Walker, Stu Lindsay,
Will Sampson
2hrs
Stu’s first time back after his hip replacement, so on
strict orders not to overdo it. Jon had car problems, so Estelle met Will
and ensured he found the dig this time.
First job was to raise the ladder, so while this was prepared, Estelle checked
the end to see if pumping was needed as it had rained a lot yesterday. Not
required, so went back up and the ladder was raised another couple of rungs up.
Once safely secured, Dave headed in to dig and Will behind him, Stu was able to
haul and lift buckets out of skip, but nothing further – he’d also brought a
new modified skip for the railway, which may need a bit more modification as it
wasn’t running as smooth as it should. Once Dave had done his 20, we all headed
out to empty the skips into bags and then Will went in to dig – down to
timescales, he only filled 10 skips and then we headed off to the pub. Bottom
skip needs replacing, so need to get another drum and cut back sooner rather
than later. Next time we move the ladder, will need an adjustable spanner to remove
the top section.
3/9/19
Estelle Sandford, Mike Moxon, Jonathan Riley, Dave Walker,
Chris Duberry
2hrs
Chris went in first to dig, we’ve found an extra bucket so
now it’s 20 each! Very easy digging tonight, mud seemed to be slicing off
nicely, he soon nailed his 20 and then Estelle dug 20, all going straight on
still, plus bringing down some from above – some didn’t need help… Mike went in
and did 20 next and because we were digging so fast, there was time for Jon to
do 20 as well! We finished off emptying buckets before heading to the pub. We
need to bring a spanner over, we also need a new skip for the bottom runway –
Jon working on getting.
27/8/19
Estelle Sandford, Jonathan Riley, Nick Hawkes, Dave Walker,
Mike Moxon
2hrs
Jon, Nick and Dave dug this week, 19 buckets each and we
sent in 5 extras to make a random 62! Still going forward and currently
ignoring and going over the boulders in the floor. Estelle was late getting
into the dig because of waiting for Will who didn’t make it in the end and Mike
was late as he was getting back from Pembrokeshire.
20/8/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley,
Dave Walker, Chris Duberry, Joan Goddard
2hrs
Mike dug first and filled 19 and then Joan filled 19 buckets
too with a bit of help from Mike. Jon came down and filled the last 19 before
we headed to the pub. Bottom skip starting to look really quite tired.
13/8/19
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker,
Chris Duberry
2hrs
James went in first, Chris turned up for the first time and
brought 2 new tubs with him, so we’re now having to learn the 19x table. After
James had filled 19, Chris took his turn and filled 19, then Estelle, then
bonus 15 buckets and Dave got to dig too as we were motoring and it wasn’t yet
pub ‘o’ clock! The ceiling seems to be coming down a bit on both left, right
and in front. The passage on the right resembles the same red ledge as further
up passage. There are some quite large boulders in the floor that could do with
excavation and removal as it is possible we should be going down. Still a lot more
clay to remove though to see what is going on more, but the chamber is getting
quite a reasonable size now. Water levels hadn’t been affected by the recent
heavy rains.
7/8/19
Estelle Sandford,
James Begley, Dave Walker, Jonathan Riley
1 ¾hours
Despite a late
start and only 4, we were pretty efficient in getting 51 skips out with Jon,
Dave and Estelle digging tonight. Still going forward, although looks like the
roof is coming down a bit, but the floor full of boulders still needs digging.
30/7/19
Estelle Sandford, James Begley, Mike Moxon, Dave Walker, Jonathan
Riley, Dave King
2hrs
James went in first to dig and discovered the dig had been self
digging again and some rocks and a lot of mud had come down - last time he dug
first he had to deal with a self dig too! He filled 17 buckets quite quickly
and Mike decanted some into an 18th as he was overfilling, plus a few rocks
came up... Mike then took over digging and also quite quickly filled his 17
buckets. As we always like to give guest diggers an opportunity to dig, we sent
Dave King to the end to see our progress and be the 3rd digger of the night -
he filled his 17 and as we were running early, we sent down bonus extras, so he
got an extra 8 to fill! total 60 buckets and several loads of rocks. The heavy
rain hadn't really affected the end water levels.
Thursday, 25 July 2019
23/7/19
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker,
Stu Lindsay, Neil Reaich, Chris Smart
2hrs
Jon and Dave had arrived first, so they headed down to the
end to start digging, with Jon at the head digging the face mostly right and
forward. There is a roof pendant, which may be a boulder, that is slowly being
exposed on the left roof above us to keep an eye on. The ‘chamber’ is continuing
to grow, but there is a reasonable puddle now in the floor making non-holey
wellies essential! Chris and Neil headed down and Dave shuffled back a place
and the rest of us manned the rest of the route. Stu followed down about
15minutes later and took over the top haul from Estelle so she was then
focussing on emptying buckets. Chris swapped in as second digger and carried on
digging more to the left and forward and did his 17 before the final swap around
and Estelle filled the last 17 buckets. Mostly from the right/shelf bit. Quite
a lot of false floor stal there and lots of yellow and red clay. Possibly worth
our while trying to focus on going down a bit and seeing what the boulders in
the floor are hiding, but there’s still quite a few weeks of easy digging
around this and the boulders may well need chemical persuasion.
Saturday, 20 July 2019
16/7/19
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker,
Stu Lindsay
2hrs
Dave went in first and filled 17 buckets. Stu slowly
descended to the end and then filled the next two rounds of buckets, so did 34
as he won’t be around soon for a few months post op. His view was that it may
be worth working on down more through the boulders. Still loads of spoil to be
removed from the area though. Puddle very little difference in height from last
week.
9/7/19
Estelle Sandford, James Begley, Jonathan Riley, Stu Lindsay,
Neil Reaich
2hrs
James went in first to dig, the roof had all come in from
above, this wasn’t unexpected really as Estelle and Mike had intentionally been
undermining this last time… All his 17 skips and also the first few of Neil’s
were from the roof. Neil got to digging out the floor a bit on his 17, before
Estelle did some digging at the left wall in front – there is a large boulder
in there too which will need bringing down soon. At 51 skips, we emptied them
all and headed to pub.
Tuesday, 25 June 2019
24/6/19
Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay,
Dave Walker
2.5hrs
Tight on numbers tonight as Jon ill and no-one else about.
Despite little rain since last week, there was quite a lot of water in the
puddle and dig so we set to clearing that first with the pump. Once cleared,
Mike got on with digging, followed by James and then Estelle. All digging in
the dig itself tonight, although mostly above into an aven as it all looks like
it wants to slump on us! Suspect it will self-dig before next time again. 52
buckets removed plus a few rocks including some of the ones stashed from last
week.
18-6-19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley,
Dave Walker, Chris Seal
2hrs
Considerable amount of rain had fallen since last visit, so
we needed to use the pump. Extended the pipe and electric cables so we could
also pump the dig too as there was a couple of feet of water in there as well.
Got the puddle as dry as we could and then proceed to spend the evening digging
that out as it’s been on the to-do list and we’ve been putting it off… Dave and
Chris went in first to dig, followed by Estelle and then Jon. The slurry in the
puddle is almost gone now and grill removed for the moment. Hopefully next week
we can get back into the dig and try and clear some in there. About 60 buckets
removed plus some rock moved to top.
Thursday, 13 June 2019
12/6/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley,
Dave Walker, Stu Lindsay
2hrs
After quite a bit of heavy rain, there was an expectation we
may have to pump – Estelle popped down to the end while the others were getting
ready and found that the dig itself was under about 18” of water, which appears
to be coming in from the aven above it, but the ‘puddle’ had only risen very
slightly. The dig looked like it was going to be easy to bale, so went out to
send first diggers down! Jon and Stu on surface and bagging happened too. James
dug first and between him and Mike they took out 7 buckets of water from the
dig to the hole in the floor up passage. James then dug from the end and it was
hard going as a lot of that white nougat type stuff, but he managed to remove a
large boulder which was passed up passage a bit for breaking up, which was done
during the session by Dave and Estelle. Mike dug next and he decided not to dig
in the dig, but to help get rid of the sediment and floor in the puddle which
really needs us to do whilst it’s drier, particularly now we know the dig will
fill up with water rather than the puddle… (although this raises another issue,
while we’ve plenty of electric cable to get to the dig with the pump, we will
need to get an extension on the blue water pipe as bringing it in a further
approx. 7-8m will bring the end too close to the top of the shaft.)
Mike removed 17 buckets and then swapped with Dave who
continued filling from the puddle area – he got extras as digging was quick and
it wasn’t quite pub time! 56 buckets total of spoil plus a few skips of rocks.
4/6/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley,
Dave Walker
2hrs
Estelle dug first, there had been a slump over the last week
from the roof to the right, so the first few buckets came from that before she
started digging. Also the puddle side is drying out so on each person’s shift,
the bucket carrier person ended up filling or topping up a sneaky few. Mike dug
next followed by Dave. All filled 17 buckets – we worked hard spread out so we
could get everything to the surface and as the 8:45 alarm hadn’t gone off, once
51 filled, we sent another 9 buckets down to fill with slop from the puddle!
Disgusting stuff, like thick chocolate sauce – hard to fill the buckets and
hard to empty and clean them… We probably need to aim to do circa 10 buckets of
this per week to get rid of this sediment before the winter! Next week’s
digging moved to Wednesday down to MCR meeting.
28/5/19
Estelle Sandford, James Begley, Dave Walker, Alex Gee,
Jonathan Riley, Stu Lindsay
2hrs
Mostly able to do the entire spoil run to surface today with
6 of us, although hard work. Used the opportunity to get rid of a lot of rocks
that had been stacked in the system and about 20 skips full of them were
removed. Stu started building a wall behind where the exit haul is that should
help protect the hauler eventually and give a bit more spoil dumping space!
Dave dug first, followed by Alex and then James. All filled 17 skips each and
were emptied with no bagging. End is continuing to look different with boulders
held together with spoil and the white nougat type stuff, which is really hard
to remove but we appear to be digging ourselves a chamber now! The puddle is
drying out a bit and the blancmange consistency looks like it might be possible
to clean some of it out soon…
21/5/19
Estelle Sandford, James Begley (late down to train delay
from London), Mike Moxon, Jonathan Riley, Dave Walker
2hrs
Hard work with 4 to start, increasing to 5 about half hour
after we started. Having to stage it, so only gives the opportunity for 3
people to fill the 17 buckets each. Estelle went in first as hadn’t seen it for
a few weeks, was very impressed as to how much progress had been made. It’s
widening out and they’ve gone down in the floor more. Lots of big boulders in
floor, but passage is quite sizable and almost made a chamber at the end now –
definitely feels like it is changing character. Jon went in next followed by
Mike and then we went to the pub.
Friday, 17 May 2019
30/4/19 and 7/5/19 and 14/5/19 - from Mike M
14/5/19 Mike Moxon, James Begley, Jonathan Riley, Dave Walker, Stu Lindsay. 3 diggers, 51 buckets removed.
7/5/19 Mike Moxon, James Begley, Jonathan Riley, Dave Walker
Decided it was still too damp to clear the silt, so another 51 tubs, plus some big rocks came out of the end, which has changed direction (angling off to the left & may have left Kevin's property, although it's too early to see if it's just stepping across). A small amount of seepage was collecting at the end & it did rain Wednesday.
30/4/19
Previous week 5O tubs worth came out, as one
empty bucket escaped down the other dig before the last haul. The puddle was
also emptied of most of it's water into the halfway slot (which hadn't
completely drained by this week).
7/5/19 Mike Moxon, James Begley, Jonathan Riley, Dave Walker
Decided it was still too damp to clear the silt, so another 51 tubs, plus some big rocks came out of the end, which has changed direction (angling off to the left & may have left Kevin's property, although it's too early to see if it's just stepping across). A small amount of seepage was collecting at the end & it did rain Wednesday.
30/4/19
Thursday, 25 April 2019
23/4/19
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker
2hrs
pumped tonight, not risen much since last week and not enough to invade the dig which Dave had lowered a bit last week into boulders in the floor. While pumping was progressing, Estelle started digging - carried on a bit down, but there are quite a few large boulders in the floor at the moment. We do need to clear more out from the floor, but it's still progressing well by digging the wall of mud/clay/rock in front of us, so will see how the water levels go on the puddle. After Estelle did her 17 buckets, Dave went in next and then Jon for 17 each, then the pub called! Have left the pump in situ, but removed the pipe from it so the sediment doesn't settle in the pipe. Found a dead baby bunny under the buckets at the start. Also noted that there seems to be some erosion of the mud/rock hedge side, we need to keep an eye on this as it may decide to come down...
16/4/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker, Stu Lindsay (although Stu didn't dig, just brought cable over)
2hrs
Stu brought back the pump from clean and looking at cabling and we also inserted the armoured cable in from the mains socket at the top to as far as it would go - part way down 'steps' - via the top dig route. He is going to sort the middle cable ready for industrial connector, so couldn't pump this week.
James set to digging, followed by Jon and then Dave. Usual 17 skips each and then we retired to the pub. Dave was digging down in a floor a bit - risky if the water rises much...!
Tuesday, 16 April 2019
9/4/19
Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay,
Jonathan Riley, Dave Walker, Pat Hillier, Olivia Gentile
2.5hrs
Estelle went in first to photograph and dig – the boulders
had been satisfactorily reduced to manageable sizes and a lot of gravel! Dave,
Pat, Mike and Liv all went in and had a session and James helped Liv at the end
of her session. A massive 87 skips removed this week, think it’s a record! End
looking easy digging still at the end and probably best part of a metre
progress made.
8/4/19
Estelle Sandford, Stu Lindsay
2.5hrs
After ending last week with a couple of large boulders
impeding digging a bit, Stu and Estelle went over to give them a bit of
chemical persuasion – satisfactory thud as we left! Drilled and dealt with the
two boulders and also a roof pendant. Also while we were there, we pumped the
puddle dry as last week it was getting a bit bigger again. Seems to be seepage
rather than anything to do with weather conditions though.
Stu took the pump away to clean and also change the
connector for industrial type one to go with the heavy duty cable we have to be
fitted.
2/4/19
Estelle Sandford, James Begley, Mike Moxon, Dave Walker,
Jonathan Riley, Pat Hillier, Harry Page
2.5hrs
Dave started off digging, there are 2 prominent boulders in
the middle so having to dig around them. The water levels had risen a bit in
the puddle making it quite mucky near the dig face. 10 buckets each going on
tonight, so once Dave had done his, Estelle took over. The roof on the left
appears to be getting lower by the 2 boulders the deeper we go, suspect we need
to seriously look at digging down. After Estelle, Mike, then Harry then Pat all
had a turn. Estelle took photos at the end and the right side roof is also
lowering. The top boulder does move a little when smacked with a hammer and a
bit did fall off, but both look like they need chemical persuasion. We also
need to look at building some sort of bund so we can retain the puddle and
start looking to dig down without it coming to join us. All looks interesting
at the end as the passage is widening, but lots of big boulders.
Friday, 29 March 2019
26/3/19 from Mike Moxon
Naomi turned up
again, with her own trowel! So Jon dug first filling 16 tubs whilst Dave tried
to break up the boulder, then we doubled shifted them back to Stuart hauling at
the entrance. Mike & Naomi filled the next 16 - repeat procedure & Dave
finished the night off to total 48. Some big blocks to reduce & remove when
we've freed them up. Then all except Naomi retired to the pub.
Friday, 22 March 2019
18/3/19
Estelle Sandford, James Begley, Mike Moxon (back for first time after
eye operation), Stu Lindsay, Dave Walker, Naomi Brazier
2.5hrs
set up the pump as the water was fairly high (probably a good 18”-2ft
above the floor at deepest part) and left it going while we did other stuff.
Raised the ladder up about 3 rungs and then went back to looking at the water,
it had dropped by about 6" by then which was starting to expose a couple
of large boulders by the dig. Another 15mins and we were just about able to dig
but just before it got to that point, Estelle removed the boulders and passed
them back to Dave to break up/get rid of. Got about an hours worth of digging,
Estelle first, then Dave then Naomi. Filling bags and also rescued mating toads
from the dig and put in the pond! It's toad rescue time of year again...
Wednesday, 6 March 2019
5/3/19
Estelle Sandford, James Begley, Stu Lindsay, Dave Walker,
Jonathan Riley
2hrs
Dropped the number of buckets each to 15! 17 last week was
too hard… Stu again opted to haul and part fill sacks, while the rest of us
took it in turns to dig. The end is now about 1.5m beyond the current end of
the puddle area and having removed a couple of large rocks, is mostly back to
mud/clay but with more large rocks starting to emerge again. The passage seems
to be sort of heading slightly left with the right side closing in a bit.
Hoping that the forecast rains don’t fill it up too much, suspect next session
will be pumping. Also next session the ladder needs raising. 2 frogs and 1 toad
rescued from spoil heap and deposited in the pond.
26/2/19
Estelle Sandford, James Begley, Stu Lindsay, Dave Walker,
Jonathan Riley
2hrs
Stu didn’t feel up to digging, he just wanted to haul on
surface and was also helping by putting the first couple of buckets in the bags
so we could then finish topping them up. The rest of us took it in turns to
fill the 17 skips we appear to have in circulation at the moment. Mike is out
of commission after an eye operation so being stuck with only 5 of us is a bit
of a killer to get to surface and all positions are hard work, but I guess a
damned good workout! The puddle was about the same level as last week, digging
is still heading forwards and we’re having to keep the floor level above puddle
height, but it’s still about 3ft or so high. Boulder in the middle that looks
like it will come out next week. Filling bags as we need to raise the ladder
again soon and also build up the wall around our hauling spot. 1st
frog of the season rescued and returned to pond.
Wednesday, 20 February 2019
19/2/19
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker
2hrs
16 skips each, having to stage it as low on numbers, but all
worked hard and dig continues looking good and going forwards. The puddle didn’t
need any pumping tonight, but is still there. We do need to try and dig down a
bit but this obviously has the risk of bringing the puddle nearer the dig face,
right hand wall is cutting across a bit and there are two quite large boulders
to the left which will need to make friends with Dr Nobel at some point.
13/2/19
Estelle Sandford, James Begley, Mike Moxon, Dave Walker,
Jonathan Riley
2hrs
Dig needed pumping tonight, so first 30mins or so was
getting it to a point where it was possible to dig. Once drained enough, Dave
got in there and started digging until he’d run out of buckets and around then
the pump reached the maximum it could pump out. Jon and Mike followed and did
the 16 skips each too, then it was pub time!
Sunday, 10 February 2019
6/2/19 from Mike Moxon
Jon, Dave & I built a wall of sorts on the top step before retiring to the Hunters. The end pool had risen enough to cover far end of grill, but only just.
22/1/19
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker,
Stu Lindsay
2hrs
Good session, although hard work with only 6 regulars now. Really
could do with recruiting a couple more in order to make the work easier. We
still did about 80 buckets of spoil though and bagged some of it on the surface
to continue the wall building. Steady progress forwards, the passage has widened
considerably and due to the ‘puddle’ we’re not going down as much at the moment,
so not sure what depth we have, there is a large boulder to the left looking straight
on which once all the spoil moved around is likely to need some Dr Nobel’s. Little rain since the last session, so the
pump wasn’t needed tonight.
15/1/19 from Mike Moxon
15th Jan - Jon, Dave & Stu did some cementing on the steps. I removed a couple of tubs worth of loose spoil from the end, cleared a tub of silt from the hole & widened the connection to upper passage.
Saturday, 12 January 2019
8/1/19
Estelle Sandford, James Begley, Mike Moxon, Dave Walker, Jonathan
Riley, Stu Lindsay
2hrs
No pumping required, Mike had brought a metal grill to go over the
hole and once we'd leveled the bottom end this proved to be very good for
hauling and we only needed 2 people below the grill, one digging and one
transporting/hauling, to get the skips hauled up. Therefore we were able to
work to get everything out in one go. Mike dug first and then Jon, before Dave
took over. Dave had proper dig fever and dug for the remainder of the evening.
Just under 70 buckets hauled out and a few bags filled as well. The end is
looking interesting - to the right is an alcove, which is full of mud and being
cleared. To the left boulder stacked in mud. Down to the puddle, we are not
digging fully down at the moment as we don't want the water to end up at the
end. Hopefully the weather will hold and allow us to keep on digging.
6/1/19 - showing Tav and Nick the dig for Complete Caves book
Estelle Sandford, Robin Taviner, Nick Hawkes
2hrs
Tav visiting towards his work on Complete Caves and both wanted to
take a look around in daylight. Showed them around all the smaller 7 holes
before getting kitted and heading down the bigger 8th to show them the current
dig and the higher series. Tav seemed quite impressed by what we had dug out
and his comment was that 'he had been in a lot of sh*tholes in the past and
this was definitely not a sh*thole'! Nick had quite a good look at the geology
and all seems quite interesting. Noted that the end puddle had not increased at
all since last week's digging so unlikely to need pumping before we dig on
Tuesday, also hole in the floor hadn't drained. James Begley joined us as we
were exiting the cave and we went and saw Kevin and the inside bones and
geology before a coffee and chat.
Tuesday, 1 January 2019
Happy new year dig! 1/1/19
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, Dave Walker, Stu Lindsay
3.5hrs
Afternoon/early evening session. Used the
pump again to get the end water levels to a point where we could dig the end,
although the slurry in front of it is rather horrible and muddy… The metal ramp
that Mike put in it has helped though so we don’t have to wallow in slurry.
While the pump was doing it’s magic, we cleared the bang remains from the hole
in the floor, removing a lot of rock scattered around and James dug out the
hole to a point where it was sort of draining the little pool in the bottom. We
had brought over some bits of wood/metalwork to aim to cover the hole so we can
drag the skip over the top, but that was a bit of a fail as it was a lot wider
than we had estimated, so hoping mike can get another piece of metalwork like
what is in the mud at the end. Once cleared, we then went to digging the end,
with Mike having first shift, Estelle second and Jon third. The end is
definitely changing, it’s a lot wider and some really big boulders on the left,
but another aven/roof hole looks like it is on the right above us. Passage now
about 6ft wide by about 3ft high, although suspect if we dug out the slurry, it
would be deeper… James got some mud in his eye and had to give up to try and
clean it out, so we emptied all the buckets and all adjourned to the
Waldegrave.
12/12/18
Estelle Sandford, James Begley, Dave
Walker, Jonathan Riley, Mike Moxon
2hrs
Kevin had got us a pump, so we set to the
job of getting it set up, firstly rolling out a rather bendy and lively length
of pipe from the dig to the surface, then feeding the electricity and pump to
the water. Pumping then commenced and after about 20mins it was looking quite
good and we could have done some digging. Looks like we now have a way of
draining! In other news, the bang was so good it filled the hole with gravel,
we’ve not touched clearing this year, also the steps look good from last week’s
cementing efforts, we need to add more. J
4/12/18
Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave
Walker, Stu Lindsay
2hrs
continued work on cementing the steps (and dug out the next one up)
while Stu prepared another bang on the hole in the passage. Kevin is sorting us
a pump to use which should be available by the weekend, so hopefully we can
then drain the end, but we will need to put something over the hole we've
created then! Bang went off well, hopefully plenty of rock to clear on next
visit.
27/11/18
Estelle Sandford, Jonathan Riley, Dave Walker
2.5hrs
cleared the bang out of the hole and passageway and broke up some
rocks and removed all from the cave apart from the larger rocks which can be
used for wall building. The hole is quite impressive - about a metre deep and
width of the passage and about 1/2m wide in the middle. Really awkward digging
as have to reach to toes, can't bend properly!
Tuesday, 20 November 2018
20/11/18
Estelle Sandford, Dave Walker, Stu
Lindsay, Jonathan Riley
2.5hrs
Looked at the end, it’s still about welly
deep in water. Plan from last week was to drill and bang the hole in the floor
half way down, either to give us a way on or at least to perhaps give us a
drain hole as it does drain slowly when we fill it with buckets of water. Stu
was left drilling holes while Estelle, Dave and Jon dug out the steps a bit
more and carried on cementing in stone to hopefully prevent subsidence if the
dig floods again this winter. Used up pretty much all of the cement and also
need more dust now and exited. Satisfactory dull thud from the bang which we
set off on exit.
13/11/18
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, Dave Walker, Mike Moxon, Stu Lindsay, Phil Hendy
2.5hrs
End still lovely and wet, puddle about
welly height. Phil came along to have a
look – first time he’s seen it since he introduced us to Kevin and the dig way
back in 2012! He helped with moving buckets around. Top where the bags are is
getting really slippery and James fell off at one point. The end is changing
but with the amount of water it’s hard to dig, but gone from high and narrow to
wide and getting lower (we think, although hard to gauge the floor depth with
the level of water…) At the start of the dig, we again poured some 4-5 buckets
of water in the hole in the floor part way up and all drained, so we are going
to blow this up and dig it out – either it may provide a way on or if not, it
may provide somewhere we can drain water off too…
6/11/18
Estelle Sandford, Jonathan Riley, Dave Walker, Stu Lindsay
2hrs
Stu brought his drill so after we'd dug it out of the water a bit and
tried to move it a bit, the big boulder in the puddle was capped and broken up.
There is quite a large puddle at the end which is not draining now, in some
places close to welly deep!
Estelle had changed wellies from last week to non holey ones, so went
to the end to dig. Filled most of the available buckets and also pulled a lot
of mud and rock from the wall. The end is mostly boulders held together by
clay/mud now and pulled out a lot of rock, some of it was broken up, but many
moved as they are to the steps. We have a lot of good rock now ready for
building into the steps. The end is now widening a bit and seems to be lowering
a bit, definitely changing again and a lot of rock... We did try putting water
down the hole part way down the passage - 4 buckets and it was full - it did
drain through the evening, but slowly.
Next week will depend on numbers and wetness of the end!
Friday, 2 November 2018
30/10/18
Estelle Sandford, James Begley, Jonathan Riley, Dave Walker, Mike
Moxon, Nick Hawkes
2hrs
After the bottom step was effectively completed last week, with Nick
there too, we went to dig the mud from around the rock that had fallen
previously and we'd brought down from the roof and then the end. about a foot
or so deep of water at the end, so quite sloppy digging. Removed quite a lot of
buckets doing it in stages as to start with we were only 5 as Mike was late,
but with 6, it's not really enough now, we do need 7 to go all the way from dig
to surface. Need to work out what to do with the remainder of the steps...
23/10/18 from Mike Moxon
Mike Moxon, Dave Walker, Jonathan Riley
Just the 3 of us. We lowered
extra sand / dust down the entrance & took concrete makings to the top of
the steps, to mix there. After checking the water level (bit higher than last
week), Dave & Jon completed walling the bottom step, whilst Mike removed 17
part buckets of mud from the top of the boulder at the end, these were dumped
on the pile between concreting. Tidied up before heading to the Hunters'. Will
need some more rock & concrete for further steps.
16/10/18
Estelle Sandford, James Begley, Mike Moxon, Dave Walker, Jonathan
Riley, Fran Campbell
2hrs
took some cement, dust and sand down and took stone back in from the
spoil dump to build a small wall/bottom step to help build up and protect the
loose looking boulder on the right. Did as much as we could in a couple of
hours and then headed to the pub! Will need to continue the work next week and
then decide on what to do next with the steps. Some water at the end and Mike
brought down more roof mud.
Sunday, 14 October 2018
9/10/18
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, Dave Walker, Fran Campbell.
2.5hrs
6 new buckets. As we were just 5 at the
start, we decided it was time to tackle the steps issue as that meant we could
bag fill as the spoil between the bags was catching up so need to raise the
bags more around the ladder especially. Took it in turns to dig – 2 people can
work on the steps, one bottom and one middle and the rest rotated around. Fran
turned up around ½ hour late and helped even the numbers. Looked at the end,
bit of a puddle. We may be able to use the big boulder as part of the steps
possibly, it still needs breaking up though. By the end of the session, we’d
cleared quite a bit of step back and decision is to cement in a retaining wall
of rock at the bottom and work up from there. The wall on the left as you look
up is currently undermined and the left side does look like it’s mainly mud
with a few large rocks in it, so this needs retaining. Right wall seems to be
solid rock at least. Get some cement, sand and dust for next week.
2/10/18
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, Dave Walker
2.5hrs
Dave had got a lot of bags from Cheddar
Ales… so stashed them in top dig for now.
Hard draft with only 5! Filled 13 or 14 buckets
each and then rotated around so we were emptying once all filled. One bucket
demised part way so time to get some more. Bringing down lots of roof and there
was a puddle in the end so a bit sloppy at times. The large boulder still needs
to come out at some point, but still a fair bit of roof to go. With the buckets
being quite wet, the steps were getting more eroded and we do need to do
something about this soon, before the winter rains set in or we get a flood
again…
Friday, 28 September 2018
25/9/18
Estelle Sandford, James Begley, Jonathan
Riley, David Walker, Mike Moxon, Jeff Broom (MCG)
2hrs
Since the end collapse last week where the
boulder came out of the roof and also a large amount of spoil, we took a step
back and focused on clearing everything from the roof about 5m from the end
onwards. A large amount was brought down and cleared, 15 skips each and it’s
getting to be really hard work with only 6, so need to do some recruitment or
look to change our processes on how we dig a bit. Getting quite wet in the
spoil area now and more bagging needed and we need to plan to raise the ladder
soon. What looked like a boulder in the roof, is looking more like a flake of
roof now and above where the big boulder had come out a few weeks back, looks
to have been a bit of one of those aven type things going on as quite a lot of
roof spoil there, but goes back to normal before and after. Next week or two
still need to focus on the roof area. Dave agreed to collect more bags from Cheddar
Ales, so thank you Cheddar Ales yet again.
19/9/18
Estelle Sandford, James Begley, David
Walker, Jonathan Riley, Mike Moxon, Kriss Cawson (MCG), Mark Denning, Pete
Hellier, Adrian Miles (BEC), Wayne (WCC)
2hrs
Moved to a Wednesday evening this week as
there was an MCR meeting Tues and generally we wouldn’t have made it
worthwhile, but Wednesday collected us a few new faces, which was useful to
move a lot of spoil rapidly and bag quite a bit too. The 4 that hadn’t visited
before headed into the upper series to have a look around it before heading
into the digging section. Estelle was doing some filming for a Hidden earth
video for the Mendip Roundup. Mark started digging first until he ran out of
steam and then James took over and dug 10 skips, then Pete, Adrian and Wayne
had a turn before Kriss went in as the last digger. During the evening there
had been a bit of dig fever going on and tunnelling rather than bringing
everything down from the roof and also clearing the floor out and a large
boulder fell out of the roof while Kriss was digging, briefly trapping him, but
he was uninjured thankfully. We brought down a load of the roof mud before
exiting the dig and next session will be a major clearing session.
Video from tonight - https://youtu.be/j6HTny9XvEc
11/9/18
report from Mike Moxon
Mike Moxon, Stu Lindsay, Duncan Simey
Whilst I embedded 3 pipes in the sack wall Duncan recalibrated the distoX, then we surveyed to the end from a point on the boulder. Meanwhile Stu drilled the fallen blocks & removed the aerial runway from the far wall. At the end I moved the tools a bit further back, so they aren't under the mud in roof. Several frogs had emerged in the rain, but we left them down the hole. First night of the darts season when we got to the Waldegrave ( but still managed to leave 5 mins before the chips)
Mike Moxon, Stu Lindsay, Duncan Simey
Whilst I embedded 3 pipes in the sack wall Duncan recalibrated the distoX, then we surveyed to the end from a point on the boulder. Meanwhile Stu drilled the fallen blocks & removed the aerial runway from the far wall. At the end I moved the tools a bit further back, so they aren't under the mud in roof. Several frogs had emerged in the rain, but we left them down the hole. First night of the darts season when we got to the Waldegrave ( but still managed to leave 5 mins before the chips)
4/9/18
Estelle Sandford, James Begley, Jonathan Riley, David Walker, Stu
Lindsay
2.5hrs
Bit lean on numbers tonight, but Stu went in first to dig as he hadn’t
for a while – got to just before the end and the boulder we had thought was
roof was suspended and of course Stu hadn’t seen the end for a while, so didn’t
immediately twig that boulder had moved since last week! Estelle noticed though
and stopped Stu before he got to it and then Stu used the bar and very easily made
it drop to the floor, where he set to starting to break it up a little before
climbing over it and continuing digging the end. The rest of us had a good go at
breaking bits off it when we were the hauling person and reduced it considerably
over the course of the night. It was very calcited inside and fractured easily
into gravel! Stu did dig for much of the night as the rest of the working spots
are quite hard work, so we did what we could on hauling and exiting the spoil.
Plan for next week when we know reduced numbers is to survey if possible and
look to reduce the boulder further, possibly chemically if needed and also to
remove some bits of rock from the haul path that are making it flow less
easily. Capping probably best or plug & feathers.
28/8/18
Estelle Sandford, James Begley, Mike
Moxon, Dave Walker, Jonathan Riley, Claire Havard, Stu Lindsay, Chris
Barrington (MCG)
2.5hrs
Good digging session, James then Dave in
first, then Claire, followed by Estelle, Jon, Mike and Chris – all on 10
buckets each, made for a good session. All bagged and looking close to being
ready to raise the ladder soon. Need more digging bags soon too. Dig is still
easy digging of mostly clays and mud with a few rocks in there too.
Saturday, 25 August 2018
21/8/18
Estelle Sandford, Mike Moxon, Duncan
Simey, Claire Havard, Jonathan Riley, Dave Walker, Stu Lindsay
2.5hrs
Good digging session with plenty of spoil
brought out. Cave still retaining similar size passage, although getting more
and more rock out of the floor and at one point we could dig the bar into what
felt like a space, but after more digging, it appears it was just looser spoil
between the rocks. Dave and Jon dug first and then Duncan took over, then
Estelle, followed by Mike and Claire, most of us doing 14 each. Lots of it
bagged and the wall is getting quite formidable! At the end of the digging
session, Mike started hitting at a rock in the roof, which appears to be
dolomitic conglomerate and he had broken it up a bit just as we finished.
14/8/18
Estelle Sandford, James Begley, Duncan
Simey, Claire Havard, Dave Walker
2.5hrs
Another good digging session despite the
low numbers tonight with other commitments. Did some in 2 stages and others as
hard work for the top team, but everyone had a good workout and the dig face is
still looking good!
7/8/18
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, Dave Walker, Stu Lindsay, Duncan Simey, Claire Havard
2.5 hours
Good digging session, lots of buckets dug
out of the cave and lots of bagging done, the bag wall is looking impressive
now and probably don’t need to bag much more for a while! End still going down
and forwards and maintaining the height and width for the most part. Getting a
few reasonable sized rocks from the dig face too.
Sunday, 5 August 2018
31/7/18
Estelle Sandford, James Begley, Mike
Moxon, Jonathan Riley, David Walker, Duncan Simey, Stu Lindsay
2.5hrs
Stu didn’t dig, but the rest of us had
around 10 buckets and a few rocks. Still going down well, more rock at the
bottom and mostly easy digging. As 7 we got to fill some bags. Couple of frogs
and toads rescued.
24/7/18
Estelle Sandford, James Begley, Jonathan
Riley, David Walker, Duncan Simey, Stu Lindsay
2.5hrs
Good session, all 6 of us had a dig. New
skip at the bottom thanks to Jon and experimenting with using old bucket bases
in the buckets to help with emptying. Few toads rescued again.
17/7/18
Estelle Sandford, James Begley, Mike
Moxon, Duncan Simey, Jonathan Riley, David Walker, Alex Gee, Tom Elliot, Sarah
Payne
2.5hrs
Good to have some fresh visitors, none had
seen the current area we were digging. Rescued yet another baby bunny before
Alex, followed by Duncan, Dave, Tom, Jon and Sarah, all had a digging session.
Sarah and Tom did the round trip into the upper series as well. 5 new purple
skips into circulation. Bottom digging skip is knackered and needs replacing,
have brought out to dry it and the ropes out, rescued a frog and a toad also.
Found remains of 2 more dead bunnies in the bottom dig. Mike has removed all the
additional kit we’d left in there for hauling and cleared out the top dig and
removed the washing line as it’s not needed and getting a bit low now!
10/7/18
Estelle Sandford, James Begley, Duncan
Simey, Dave Walker, Fran Campbell
2.5hrs
Started with 4 of us, hard work and had to
stage it with digger filling all 9 buckets and then all coming up to top
section to drag out and empty. Once Fran arrived, we managed to spread out
enough to stagger all of it – damned hard work with 5 still… Lots of rock
removed too as well as the 9 buckets each.
Need to look to replace the drag skips,
get more buckets and also take a knife down so we can change one of the ropes.
3/7/18
Estelle Sandford, James Begley, Mike
Moxon, Duncan Simey, David Walker, Jonathan Riley
2.5hrs
One baby bunny caught, other managed to
escape and disappear sadly. Several toads rescued too. Another good digging
session and the rock removed from passage so the bottom skip goes further now
making it easier at that end. Still going down nicely, getting a few more
larger rocks in the lower spoil.
26/6/18
Estelle Sandford, James Begley, Mike
Moxon, Duncan Simey, David Walker, Jonathan Riley
2.5hrs
Couple of toads to rescue as usual for
this time of year. Good digging session, steadily going down, started to remove
a lump of rock stopping the 2nd skip from going further and broke up
remains of a another rock to come out.
Thursday, 21 June 2018
19/6/18
Estelle Sandford, James Begley, Mike
Moxon, Mike Waterworth, Jonathan Riley, David Walker
2hrs
With a few people away, it was good to
have Mike W back this week to make up the 6 meaning it wasn’t too hard to dig!
Mike took the front for the first 15-20 skips, then Estelle took over, then
Dave, followed by Mike M and Jon. James still suffering shoulder problems and
didn’t want to dig. Changed the top rope on the bottom skip for a nicely
knotted one, which made it a lot easier, need a knife for the other end as a
pair of scissors isn’t robust enough. A good sized rock had come out of the
wall on the left hand side since the last session, but that was broken up by Mike
M and came to surface. Quite a lot of rock coming out at floor level now, so
hopefully that’s a good sign.
11/6/18 - ladder lifting
Estelle Sandford, James Begley, Mike Moxon, Martin Cross,
Jonathan Riley, Dave Walker, Stu Lindsay
2hrs 5mins
Arrived to find 5 baby bunnies hiding around the skips,
these were soon put in a digging bag as they were going to leap from the bucket
and then exited from the cave and released away from the entrances. No idea
where the mum went and hopefully they are old enough to thrive on their own.
Also rescued 3 toads tonight.
Good digging session, quite dry digging and filled a good
number of bags to raise the ladder buy another couple of feet so it’s in a
really comfortable position now. Plenty of spoil dumping space around it. Dig
at the end still heading slowly on and down in same sort of dimensions. Need to
replace the ropes on the bottom skips for decent knotted ropes. At the end of
the session lifted the ladder.
5/6/18
Estelle Sandford, Duncan Simey, Mike
Moxon, Martin Cross, Jonathan Riley, Dave Walker, Stu Lindsay, Fran Campbell.
2.5hrs
Good digging session, my back was playing
up so only hauled for the evening, but lots of bags filled and at the end of
the digging session, raised the ladder by another layer of bags. At the start
of digging found a dead pigeon in the dig, looked like a sparrowhawk had given
it a beating and it hid in the dig (and shat everywhere…)
29/5/18
Estelle Sandford, Mike Moxon, Duncan
Simey, Jonathan Riley, David Walker
2.5hrs
Very hard work… found a dead baby bunny at
the top which we buried. Took a skip down to the bottom to try and make the
bottom work easier. The poor person with the steps and the haul is hard work
now, but the rest is easier! All had a dig during the evening. Still going
nicely down although right hand wall has a curve going on currently.
22/5/18 back at the end digging
Estelle Sandford, James Begley, David
Walker, Jonathan Riley, Mike Moxon, Duncan Simey
2.5hrs
Another good session, finally digging the
end again after clearing the last of the infill from the winter floods. Found a
baby bunny at the end, sadly we couldn’t catch it so it’s likely to meet its
demise. More toads rescued.
15/5/18
Estelle Sandford, Mike Moxon, Duncan
Simey, Jonathan Riley, Martin Cross
2hrs
Still clearing the debris from winter
flooding, last of it hopefully tonight so first digger in next week should be
digging the end.
8/5/18
Estelle Sandford, Jonathan Riley, Mike
Moxon, Duncan Simey
2hrs
Investigated the end of the dig first and
it is dry enough to access and dig, but there is a lot of slumped in spoil to
clear before we can start digging again. Estelle started digging the steps
until tired and then swapped out so Jon could dig. We found we needed 3 in the
cave ideally, so Mike on the outside was having a hard time with having to haul
and empty. Swapped again for Duncan for a while and then Mike at the end. We
definitely need a minimum of 5, preferably 6 or 7 next week. Hopefully we’ll be
able to start digging the end before the end of the next session.
24/4/18
Estelle Sandford, James Begley, Mike
Moxon, Duncan Simey, Dave Walker, Jonathan Riley
2hrs
Dave remembered a knife so got to cutting
the skip to fit the buckets. Started on the mission of clearing out the slumped
in from the end of the railway. Got part way down the steps by the end of the
night taking it in turns to dig. Still at least another 1-2 sessions before
we’ll be at the end, assuming the water levels drop any time soon…
Monday, 23 April 2018
17/4/18
from Mike Moxon - him, Stu, Dave & Jon present.
Level had dropped again to about an inch on the shelf where
we left the empty bags, so I dug all 5 lots of them out & stacked wet mud
on right of passage to come out later. Stu, Dave & Jon worked on supporting
the rails.
3/4/18 water levels back up, but railway work commences
Estelle Sandford, James Begley, Jonathan Riley, Stu Lindsay, David
Walker, Duncan Simey
2hrs
having made the decision last week that we need to give the railway a
go and remove the aerial runway, that was the plan for this evening. Armed with
tools and capping kit, the railway was lowered in from the top. The dig was
looked at for water levels and it's back up above the step down again, probably
back to nearly the highest we've seen it as it had done nothing but rain for
the last few days - suspect we're a good month away from getting back into
digging the end, but there is quite a bit of clearing and tidying up we can be
getting on with in the meantime.
Aerial runway removed, Stu set to work dealing with the stubborn hump
of rock in the middle, around 8-10 caps later and it was relatively flat. The
railway was laid out and we'll look to get some bags under it to make it more
stable as we fill some. Need more brewery bags. Headed to pub after. Also
removed some frogs/toads and newts from the big hole and also the one with the
stemples in.
27/3/18 water levels dropping a little...
Estelle Sandford, Jonathan Riley, David Walker.
2hrs
went to have a look at the state of the water levels and see what
maintenance we need to do also. There has been some collapse at the hedge end
of the shaft and also under the opposite end, including one end of the washing
line being ripped out, including it's rock that it was bolted to. We took a
look in the dig and it was about 10m from the end and possible to see the end
wall. There was a dead baby rabbit in the water, which we removed. There is a
lot of mud washed/slumped in from where it's been flooded and the steps are
pretty much gone, so we do need to do quite a bit of clearing. Looked in the
other dig and that has also slumped quite a bit, found another baby rabbit dead
in the water there. Removed that too and also there was one near the entrance to
the main dig dead. Removed 10 toads and 2 newts with an additional newt from
the stempled hole. With the washing line down, we collected the bags up and
those that were clean are bagged up ready for use. Those still dirty put back
on the other ladder and remaining section of line. Where the collapse by the
hedge end is, we dug the ladder out and also the two skips that had been buried
by it. One is trash and the other may be of use. Also did some wall building
with the additional rock that had come down. Decision made that next week we'll
remove the aerial runway and replace it with the railway Stu made ages back.
Sunday, 4 March 2018
4/3/18 still flooded...
Dave Walker checked again today and the dig is still flooded. With the snow melt and more rain on the radar, i guess it may well remain flooded for a little while longer yet...
Sunday, 28 January 2018
28/1/18 still flooded...
Dave Walker had gone across on the 14/1/18 to check and it was slightly lower than previous weeks, but still flooded.
28/1/18
28/1/18
Estelle Sandford, James Begley went to check dig
Dig still flooded, didn't need to go down the
ladder really to check as could see the levels of the bottom dig... Estelle did
go down to check though as wanted to see how far it might have come up. The
buckets at the entrance to the top dig haven't moved or got water in, so it
hasn't reached there at all. I reckon judging by the walls though that it's
been about a metre higher than it is now. What is more concerning is that there
has been a slump below the hedge and you can see quite a lot of roots and not
very much of one of the ladders below that had bags hanging on it as it's a bit
buried!




Sunday, 7 January 2018
7/1/18 still underwater...
Estelle Sandford
10mins
A quick trip down to see where the water levels were at.
They have risen by a good foot or more and possibly were more judging by the
wet/dry looking patch on the rock – currently at top step level of the stepped
bit. We’ve had a bit of a collapse of white stuff at the end of the aerial
runway section. I didn’t drop down any further than sitting on the ledge by the
aerial runway to take photo. Reckon at least a week of dry weather likely to be
needed to drain this…
Tuesday, 2 January 2018
NYE flood! 31/12/17
Estelle Sandford, James Begley, Duncan Simey, Miri Simey, Dave Walker, Jonathan Riley and Mike Moxon turned up just as we were leaving.
30mins
Arrived and got kitted and headed down to be met with a completely flooded dig thanks to the very heavy rains in the last week or two. Old bottom dig had about 7ft head of water and main dig, about 20m of passage is submerged and it’s up to the 2nd step on the steeper slope… May take a day or two to clear with the horrendous weather forecast.
12/12/17
Estelle Sandford, James Begley, Duncan Simey, Mike Moxon, Jonathan
Riley, Dave Walker
2.5hrs
full on session of 15 buckets each so 90 done total. Quite wet
outside, but good progress. Need more people next time so we can fill some
brewery bags around the bottom of the ladder.
Sunday, 10 December 2017
5/12/17
we had expected something much smaller, not a deep shaft and a fairly comfortable-sized passageVelma Aho, Mika Ahvenniemi, Jukka Erik Palm, Pasi Suominen, Richard Sore, Miri Simey, Duncan Simey, Dave Walker, Mike Moxon, Jonathan Riley
A visiting group of four Finns joined the dig. We were all very impressed by it, as to dig in. Each of us took turns to dig 6 buckets' worth, and some of us got so into it they didn't want to stop. Ferrying buckets was less fun, but greatly helped by the aerial tramway. All in all a surprisingly entertaining evening; we're happy we got to see the dig and make it that tiny bit bigger!
Words from Velma Aho