Estelle Sandford, James Begley, Jonathan Riley, Dave Walker,
Chris Duberry
2hrs
James went in first, Chris turned up for the first time and
brought 2 new tubs with him, so we’re now having to learn the 19x table. After
James had filled 19, Chris took his turn and filled 19, then Estelle, then
bonus 15 buckets and Dave got to dig too as we were motoring and it wasn’t yet
pub ‘o’ clock! The ceiling seems to be coming down a bit on both left, right
and in front. The passage on the right resembles the same red ledge as further
up passage. There are some quite large boulders in the floor that could do with
excavation and removal as it is possible we should be going down. Still a lot more
clay to remove though to see what is going on more, but the chamber is getting
quite a reasonable size now. Water levels hadn’t been affected by the recent
heavy rains.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.