Tuesday 20 November 2018

20/11/18


Estelle Sandford, Dave Walker, Stu Lindsay, Jonathan Riley
2.5hrs
Looked at the end, it’s still about welly deep in water. Plan from last week was to drill and bang the hole in the floor half way down, either to give us a way on or at least to perhaps give us a drain hole as it does drain slowly when we fill it with buckets of water. Stu was left drilling holes while Estelle, Dave and Jon dug out the steps a bit more and carried on cementing in stone to hopefully prevent subsidence if the dig floods again this winter. Used up pretty much all of the cement and also need more dust now and exited. Satisfactory dull thud from the bang which we set off on exit.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive