Just the 3 of us. We lowered extra sand / dust down the entrance & took concrete makings to the top of the steps, to mix there. After checking the water level (bit higher than last week), Dave & Jon completed walling the bottom step, whilst Mike removed 17 part buckets of mud from the top of the boulder at the end, these were dumped on the pile between concreting. Tidied up before heading to the Hunters'. Will need some more rock & concrete for further steps.