16/4/19

Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker, Stu Lindsay (although Stu didn't dig, just brought cable over) 2hrs Stu brought back the pump from clean and looking at cabling and we also inserted the armoured cable in from the mains socket at the top to as far as it would go - part way down 'steps' - via the top dig route. He is going to sort the middle cable ready for industrial connector, so couldn't pump this week. James set to digging, followed by Jon and then Dave. Usual 17 skips each and then we retired to the pub. Dave was digging down in a floor a bit - risky if the water rises much...!