Estelle Sandford, James Begley, Mike Moxon, Dave Walker, Jonathan
Riley, Stu Lindsay
2hrs
No pumping required, Mike had brought a metal grill to go over the
hole and once we'd leveled the bottom end this proved to be very good for
hauling and we only needed 2 people below the grill, one digging and one
transporting/hauling, to get the skips hauled up. Therefore we were able to
work to get everything out in one go. Mike dug first and then Jon, before Dave
took over. Dave had proper dig fever and dug for the remainder of the evening.
Just under 70 buckets hauled out and a few bags filled as well. The end is
looking interesting - to the right is an alcove, which is full of mud and being
cleared. To the left boulder stacked in mud. Down to the puddle, we are not
digging fully down at the moment as we don't want the water to end up at the
end. Hopefully the weather will hold and allow us to keep on digging.