Tuesday, 1 January 2019

Happy new year dig! 1/1/19


Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker, Stu Lindsay
3.5hrs
Afternoon/early evening session. Used the pump again to get the end water levels to a point where we could dig the end, although the slurry in front of it is rather horrible and muddy… The metal ramp that Mike put in it has helped though so we don’t have to wallow in slurry. While the pump was doing it’s magic, we cleared the bang remains from the hole in the floor, removing a lot of rock scattered around and James dug out the hole to a point where it was sort of draining the little pool in the bottom. We had brought over some bits of wood/metalwork to aim to cover the hole so we can drag the skip over the top, but that was a bit of a fail as it was a lot wider than we had estimated, so hoping mike can get another piece of metalwork like what is in the mud at the end. Once cleared, we then went to digging the end, with Mike having first shift, Estelle second and Jon third. The end is definitely changing, it’s a lot wider and some really big boulders on the left, but another aven/roof hole looks like it is on the right above us. Passage now about 6ft wide by about 3ft high, although suspect if we dug out the slurry, it would be deeper… James got some mud in his eye and had to give up to try and clean it out, so we emptied all the buckets and all adjourned to the Waldegrave.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive