Sunday 10 February 2019

22/1/19


Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker, Stu Lindsay
2hrs
Good session, although hard work with only 6 regulars now. Really could do with recruiting a couple more in order to make the work easier. We still did about 80 buckets of spoil though and bagged some of it on the surface to continue the wall building. Steady progress forwards, the passage has widened considerably and due to the ‘puddle’ we’re not going down as much at the moment, so not sure what depth we have, there is a large boulder to the left looking straight on which once all the spoil moved around is likely to need some Dr Nobel’s.  Little rain since the last session, so the pump wasn’t needed tonight.