Wednesday 23 November 2022

22/11/22 too wet to dig

Estelle Sandford, James Begley, Mike Moxon, Dave Walker, Jonathan Riley, Chris George, Duncan Butler, Stu Lindsay

1hr

48hrs of heavy rains ahead of digging evening, so unsurprisingly the end was too wet to comfortably dig. The grill was underwater and was overflowing into the dig, but it wasn't as bad as 2 weeks ago, probably about half the depth. Hopefully if we can have a few dry days ahead of next week we can get back in to dig. 

With the lack of digging, we turned our attention to looking at securing the bag wall and building a concreted and secured retaining wall in front of it as while it is ok at present, if we continue getting higher and higher, it's going to put more pressure on the bottom bags. This can be a winter project should we get flooded out completely if the water table rises too much. Duncan took away some measurements and will look at a shopping list of items needed, but mostly a lot or rebar and shuttering and also will need quite a lot of cement to build the wall. 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive