Monday 5 April 2021

27/10/20

 

Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker

2hrs

Cementing the wall by the steps as reinforcement to stop slumping. Also filled a load of bags with mud from the top to add to the wall levels at the top for retaining spoil before heading off to the Waldegrave.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive