Estelle Sandford, James Begley, Mike Moxon, Dave Walker
2hrs
Cement and dust brought over tonight by Dave, so wall
building session planned. James went to the end and reported back that the
levels had dropped a little but probably not that much and there’s still no way
of digging the end without it dropping further or sorting pumps. Dave then went
in and took a look too. We then set to Dave cement making, James wall building,
Estelle digging out the collapse at the end of the railway and Mike hauling and
between him and Dave, more bag filling for the retaining spoil walls. 3 mixes
later and the wall is probably about where it needs to be and Estelle had dug
out the bank – lots of the white clay had been exposed and there is a rock that
may need removing at some point – am sure it’s slid down that bank more than it
was before! As it was warmer, we sat at the top of the ladder for a beer before
heading home – roll on the Waldegrave opening properly!