Monday, 19 April 2021

13/4/21

Estelle Sandford, James Begley, Mike Moxon, Dave Walker

2hrs

Cement and dust brought over tonight by Dave, so wall building session planned. James went to the end and reported back that the levels had dropped a little but probably not that much and there’s still no way of digging the end without it dropping further or sorting pumps. Dave then went in and took a look too. We then set to Dave cement making, James wall building, Estelle digging out the collapse at the end of the railway and Mike hauling and between him and Dave, more bag filling for the retaining spoil walls. 3 mixes later and the wall is probably about where it needs to be and Estelle had dug out the bank – lots of the white clay had been exposed and there is a rock that may need removing at some point – am sure it’s slid down that bank more than it was before! As it was warmer, we sat at the top of the ladder for a beer before heading home – roll on the Waldegrave opening properly!

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive