Thursday 24 March 2016

22/3/16

Estelle Sandford, Mike Moxon, Stu Lindsay, Dave King
2.5hrs
started off with issues with electricity. Kevin's drill required it for us to cap in there. After a bit of fettling, the neutral wire was found to be off in the top extension lead, so once repaired, we took the drill down and Stu started capping while Mike went into the dig to dig.  Estelle and Dave initially went scouting for frogs and toads and removed some more to the pond before helping Stu. Bottom dig still wet and needs the rocks capped, but focused on capping the top rocks and have removed quite a lot more rock now. 