Wednesday 9 March 2016

16/2/16 - logging on behalf of Mike Moxon

Last Tuesday Stu L & I arrived at the dig to find a lot of leaves plastered around the walls & the slope between both entrances had slumped, burying the extension cable. The mud was everywhere slick & we realised the hole had flooded to about 2 foot above the lower entrance (just as well we gave the previous Tuesday a miss!). We cleared a lot of mud out of / away from the lower entrance to prevent it getting washed in again, but guess the mud we are chucking into the bottom is reducing the drainage. When Dave King arrived we tirfored the big boulder further out of the way & took the winch out to the surface so it can be washed (along with the drill for drying). There was a large frog in the corner dig, who must have been woken up by the water - we left him down there.