Estelle Sandford, James Begley, Mike Moxon and Kevin Clinton
2hrs
Arrived and had a look and is looking much larger post bang.
James went in and started work on clearing while Estelle hauled and Mike
emptied as hole 6 is a puddle at present so no digging there tonight. Rope
really slippery so beneficial to have two on surface, until James got below
ledge and needed someone at the bottom to help, so Mike went in and assisted
leaving Estelle hauling and emptying! Kevin turned up around half way through
and assisted with emptying the skips. Mike and James swapped and Mike continued
digging out the hole in the floor. The two holes seen by Estelle last week can
see water worn beyond, but there is a hole in the floor following the back wall
down that also looks interesting. May need more Dr Nobels next time, but also
need to do a bit more digging around the floor hole. Good evenings work, some
30+ skips removed of rock and spoil.