Thursday 28 July 2022

26/7/22

Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay, Jon Riley, Dave Walker, Duncan Butler, Chris George

2hrs

Dave went in first to dig tonight, still dry and after people gradually moving the slurry out, it is getting less and less. Dig is still wetter to the left and more boulders and really solid spoil to the right, maintaining a good sized chamber similar to the one with the pool/slurry in (feeling like these sort of chambers ought to be named at some point...). Whilst Dave was digging, Jon and Estelle looked at possible engineering ideas to put in a drag across the 1st chamber so the no 2 from the digger can be the other side of the dam and load up from there. Rocks were used to level off the 2 metal grids which have been put in a position that would facilitate a drag tray, but to stabilise, it would be better to put some bags of spoil on top of the rocks below the grids, may need conveyor belt, which Estelle has some of in garage, but will see how things go. Jon took over from Dave digging and did around 20ish buckets before we headed to Waldegrave. 2 buckets were taken out of commission with broken handles tonight.

We need to get more buckets and another spade (ES to get from CRS) and Dave is going to Cheddar Ales to pick up more digging bags before next week.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive