Wednesday 8 December 2021

7/12/21 Storm Barra made no difference to the water levels...

Estelle Sandford, James Begley, Mike Moxon, Jon Riley, Dave Walker, Stu Lindsay, Fran Campbell

2hrs

James and Mike went to the end, the water levels were unchanged from last week, despite Storm Barra causing a bit of rain in the last day. James dug first continuing down into the floor where Estelle and Dave had been digging last week, pulling out more gravel and rocks, not clear it’s at the bottom, but definitely a different floor to what we’ve been used to. Estelle turned up about 30mins in with buckets being backed up at the inside end of the railway and hauled them out and emptied. At changeover digger to Mike, who continued more forwards on digging, Jon came outside and everyone else moved down one apart from the 2 at the bottom, Fran appeared with about 30mins to go and helped Jon with emptying. 42 skips filled during the evening. We need to look at getting some replacement trugs soon as many of them are splitting and handles going now.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive