Wednesday 7 June 2017

6/6/17

blog post written by Mike Moxon

Duncan & I arrived before Stu & Jon, so Duncan went to look for survey points in the top passage, whilst I went to check out the main dig - turned out some of the mud had collapsed at the end of the passage, so I levered out some more & found another small aven. Once Stu & Jon had arrived they started fixing the cable & I filled the buckets from the collapse before hand over handing them back to the spoil heap. Cable fixed at both ends & first bucket run back along it, but needs more work in removing rock that gets in the way (mainly on floor). Some more of the collapse still to remove as well.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive