Thursday 6 October 2016

6/9/16

Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay
2hrs
Mike set to work in the dig first and removed the two boulders in the floor, but these were too heavy for Estelle to move, so she set to trying to break them up a bit with the hammer. Noticed that another rock in the roof looked a little loose, so Mike came out and prodded a bit and brought more ceiling down. Mike did a little more digging while Estelle passed up to James and Stu the boulders that were small enough. Mike then took to beating boulders while Estelle had a dig. Mike did some then James had a go and finished them off. Dig itself is draughting well from the right, which probably links to the dig from the higher section and is digging very interesting colours of sediment layers to the level which is very squidgy on top, so probably where the water flowed. 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive