Tuesday 27 August 2013

Wednesday 7th August

Estelle Sandford, James Begley, Mike Moxon
1.5hrs
We were going to go down HLIS, but as no bags at the Belfry and no drill/plug and feathers sorted, we left Mark and Stu to go and take some photos and retrieve the ladders and rope from down there and headed over to Cutlers as we’d not managed to get over there since Kevin back from holidays. Arrived and met Kevin and he went and fixed the pump wire that he thought was the problem with the digger and we started digging. Got 2 bags out of each of the two holes, but digger not stopping still so we called Kevin back and he had a look and showed us how to turn it off manually as the electric part of the pump isn’t actually working! Main dig draining, but the mud was quite wet, other dig not draining yet. Pond even lower with little rain but Little Grebe’s have chicks now!

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive