Saturday 26 June 2021

22/6/21

Estelle Sandford, James Begley, Mike Moxon, Jon Riley, Dave Walker Stu Lindsay

1hr 45mins

Good to have a team of 6 for a change, another 1 or 2 would make it even easier though! The water levels were about the same as last week, we had fairly constant rain over Sunday and Monday, so not unexpected, but it does feel like it isn’t going down as fast this year, probably down to the clay puddling in the pool and making a good seal! Jon went in first to dig and dug at speed to fill his 17 buckets from the higher level of the bank of spoil ahead. Estelle then dug 17 buckets worth continuing working down the spoil bank. The roof is coming down a bit at the moment, but we are not able to easily dig the floor out due to the water so don’t know how deep the mud/clay/rocks below us actually are. Dave then went in and did 17 buckets too. There was no requirement for all to go out and help empty buckets between each digger, which saved us a lot of time and meant we were able to fill 51 buckets (+ 1 rock) quicker than we’d done 34 last week! Hopefully we’ll have a drier week and the water levels will drop by next time a bit further. We have got several buckets and also some of our digging tools heading towards end of life, so will need to go shopping soon. Headed to Waldegrave afterwards






No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive