Monday 14 September 2020

1/9/20

James’s birthday treat, he got to go and dig first! Quite a wet muddy puddle at the end still, but able to dig the end wall ok and just get wet up to the knees while kneeling in the water! He filled 18 skips and then Estelle took over for around 18 skips – she dug around the pool/stones more and lowered the water level a bit. Mike Moxon went in and did around a dozen skips as pub was calling – the spoil was being bagged on the surface this time as enough to make it worthwhile. Hopefully the water levels will drop off further by next time. 2hrs


No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive