Estelle Sandford, James Begley, Dave Walker, Stu Lindsay,
Will Sampson
2hrs
Stu’s first time back after his hip replacement, so on
strict orders not to overdo it. Jon had car problems, so Estelle met Will
and ensured he found the dig this time.
First job was to raise the ladder, so while this was prepared, Estelle checked
the end to see if pumping was needed as it had rained a lot yesterday. Not
required, so went back up and the ladder was raised another couple of rungs up.
Once safely secured, Dave headed in to dig and Will behind him, Stu was able to
haul and lift buckets out of skip, but nothing further – he’d also brought a
new modified skip for the railway, which may need a bit more modification as it
wasn’t running as smooth as it should. Once Dave had done his 20, we all headed
out to empty the skips into bags and then Will went in to dig – down to
timescales, he only filled 10 skips and then we headed off to the pub. Bottom
skip needs replacing, so need to get another drum and cut back sooner rather
than later. Next time we move the ladder, will need an adjustable spanner to remove
the top section.