Wednesday 24 May 2017

16/5/17 New Ladder!

Estelle Sandford, James Begley, Stu Lindsay, Jonathan Riley
2.5hrs

New ladder! Stu had attached a bit of wood to the bottom of the section we retrieved from HLIS. He set to drilling the holes to join that to the longer section from WP. The rest of us moved the remains of the scaffold tower to by the greenhouse and then assisted Stu with bolting the sections together. Long section is in the middle and the shorter WP section at the top. It was very heavy, but we decided the best way to handle it was for Estelle to go down the bottom via the old ladder so as to help move that and guide at points where it was safe to do so! Estelle assisted lifting the bottom of the old ladder to the right to give space for the new one and the new one was lowered into place with ropes, while Estelle hid at the entrance to the dig in case any rocks came down. Once the ladder was on the floor, Estelle guided the bottom, but it was decided the old one needed to be removed to make it easier to relocate the new one into the best position. Old ladder removed, new one in position, needs some work to stabilise the bottom and build up some rocks around it as it’s above the location where the old one and there’s a hole where the old one was. The top has been temporarily tied off with ropes as bolts need to be put in place to secure it with chains, but ran out of light and time (and weather as it started to rain!) so retreated to the pub. 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Blog Archive