Thursday 6 October 2016

4/10/16

James Begley, Stu Lindsay, Duncan Simey

James to add detail... Estelle went to Brownsea Island instead and left the lads digging - think it was a bit too much hard work with only 3! 

27/9/16

Estelle Sandford, James Begley, Duncan Simey, Stu Lindsay, Mike Moxon
2hrs
When we arrived we decided that we'd try and move an RSJ to nearer the cave, but between 5 of us, this was still quite hard going. Kevin had provided an old trolley, which didn't look like it would take it, but was stronger than it looked. We got it across the lawn and down the slope but there is no way that will go across the field, so need to wait until Kevin is back and do it then with the digger.
Good digging session, James in first, Duncan in second and then Stu in to finish the session off. Is easy digging in mud and some water-worn rocks in the mud. The mountain of spoil heap is getting quite large now! 

6/9/16

Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay
2hrs
Mike set to work in the dig first and removed the two boulders in the floor, but these were too heavy for Estelle to move, so she set to trying to break them up a bit with the hammer. Noticed that another rock in the roof looked a little loose, so Mike came out and prodded a bit and brought more ceiling down. Mike did a little more digging while Estelle passed up to James and Stu the boulders that were small enough. Mike then took to beating boulders while Estelle had a dig. Mike did some then James had a go and finished them off. Dig itself is draughting well from the right, which probably links to the dig from the higher section and is digging very interesting colours of sediment layers to the level which is very squidgy on top, so probably where the water flowed. 

23/8/16

Estelle Sandford, James Begley, Mike Moxon, Stu Lindsay, Mark Denning, Kevin Clinton
2.5hrs
Mark went in and saw all the cave and digs as he'd not been here since the big hole was dug, but the rest of us didn't really go far underground as the evening was spent putting a scaffold tower ready to start work putting an RSJ above and getting a staircase put in. Scaffold tower fitted nicely around the ladder, there can't be too many digs you can fit a scaff tower in apart from Templeton!