Sunday, 14 October 2018

9/10/18


Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker, Fran Campbell.
2.5hrs
6 new buckets. As we were just 5 at the start, we decided it was time to tackle the steps issue as that meant we could bag fill as the spoil between the bags was catching up so need to raise the bags more around the ladder especially. Took it in turns to dig – 2 people can work on the steps, one bottom and one middle and the rest rotated around. Fran turned up around ½ hour late and helped even the numbers. Looked at the end, bit of a puddle. We may be able to use the big boulder as part of the steps possibly, it still needs breaking up though. By the end of the session, we’d cleared quite a bit of step back and decision is to cement in a retaining wall of rock at the bottom and work up from there. The wall on the left as you look up is currently undermined and the left side does look like it’s mainly mud with a few large rocks in it, so this needs retaining. Right wall seems to be solid rock at least. Get some cement, sand and dust for next week.

2/10/18


Estelle Sandford, James Begley, Mike Moxon, Jonathan Riley, Dave Walker
2.5hrs
Dave had got a lot of bags from Cheddar Ales… so stashed them in top dig for now.
Hard draft with only 5! Filled 13 or 14 buckets each and then rotated around so we were emptying once all filled. One bucket demised part way so time to get some more. Bringing down lots of roof and there was a puddle in the end so a bit sloppy at times. The large boulder still needs to come out at some point, but still a fair bit of roof to go. With the buckets being quite wet, the steps were getting more eroded and we do need to do something about this soon, before the winter rains set in or we get a flood again…

Blog Archive